A week ago Thursday, 10/27/22, the town inspector came out and signed off the paperwork. The next day the installer submitted it to the power company. Technically tey have until the day after Thanksgiving to install the meter.
Better picture of that south side (obviously before the work was quite finished). Picture was part of the submission the installer sent to the utility
Progress! (The installer caught some pretty foliage, too!)
Posted by: Cop Car | November 05, 2022 at 09:51 AM